Fremantle Stars/eCoach

(eCoach)
m (Roadmap / Current Status: update version, text probably needs updating too)
 
(5 intermediate revisions not shown)
Line 1: Line 1:
-
===Roadmap===
+
{{out of date}}
 +
== Roadmap / Current Status ==
-
Next version will include:
+
'''eCoach 1.65''' is in [[extras]]
-
* Working GPS
 
-
* Re-designed UI
 
-
** eCoach will have new more finger friendly and more "Fremantle Style" UI. Still waiting graphics from UI designers.
 
 +
* New UI almost ready
 +
* New map engine - OSM-GPS-MAP (same as in OSM2GO).
 +
* User can now select used map source. Currently supports: OSM, Open Aerial Maps, Maps for free, Google Maps and Virtual Earth. New map engine also does map loading and caching itself so separate ecoach-maptile-loader package is no longer needed.
 +
* User can now set GPS update interval, this will lower power consumption
-
* Improvements in map downloading
+
'''Things still to be implemented:'''
-
* Filter for bogus GPS / Heartrate data
+
* Proper view for showing information about on going activity speed,time,HR etc.
 +
* Calendar integration (investigation going on)
-
* Integration with calendar backend
+
[[Category:Fremantle]]
-
** Needs investigation how to implement because there seems to be only c++ api
+
[[Category:GPS]]
-
 
+
[[Category:Software]]
-
 
+
-
Hopefully all this will be done by the end of July
+

Latest revision as of 14:54, 13 September 2010

Image:Ambox_content.png
This article is out-of-date, and needs to be updated.
Please see the talk page for discussion.

[edit] Roadmap / Current Status

eCoach 1.65 is in extras


  • New UI almost ready
  • New map engine - OSM-GPS-MAP (same as in OSM2GO).
  • User can now select used map source. Currently supports: OSM, Open Aerial Maps, Maps for free, Google Maps and Virtual Earth. New map engine also does map loading and caching itself so separate ecoach-maptile-loader package is no longer needed.
  • User can now set GPS update interval, this will lower power consumption

Things still to be implemented:

  • Proper view for showing information about on going activity speed,time,HR etc.
  • Calendar integration (investigation going on)